Close-up of an elevator door interlock and safety gear mechanism

05 / Safety & Quality

Safety is a process, not a feature.

Safety is the result of correct engineering, suitable safety systems, careful installation, thorough commissioning and maintenance that is actually carried out. We treat all five as our responsibility.

Five responsibilities

Where elevator safety actually comes from.

  1. 01

    Correct engineering

    The right elevator type, capacity, speed and safety configuration for the building and its users.

  2. 02

    Suitable safety systems

    Safety provisions specified according to the configuration and applicable requirements.

  3. 03

    Careful installation

    Alignment, wiring and safety circuits installed by our own trained team.

  4. 04

    Thorough commissioning

    Every safety function tested and verified before the elevator is handed over.

  5. 05

    Maintenance actually carried out

    Regular qualified maintenance that keeps safety systems working as designed.

Safety provisions

What Rudrax systems incorporate.

Depending on configuration, Rudrax elevators incorporate provisions such as the following. Specific provisions depend on the elevator type, configuration and applicable requirements, and are confirmed in writing in your quotation.

  1. 01

    Door safety interlocks

    The car cannot move unless landing and car doors are properly closed and locked.

  2. 02

    Emergency alarm & stop systems

    Passengers can raise an alarm and stop the car when required.

  3. 03

    Overload protection

    Where applicable, the elevator will not start when the rated load is exceeded.

  4. 04

    Emergency rescue provisions

    Defined procedures and equipment to safely release trapped passengers.

  5. 05

    Battery-operated rescue (ARD)

    Where specified, brings the car to the nearest floor and opens the doors during a power failure.

  6. 06

    Accurate levelling

    Precise stopping at each floor to reduce trip hazards — critical for hospitals and the elderly.

  7. 07

    Structured commissioning

    A defined sequence of tests and checks, recorded before handover.

  8. 08

    Technical documentation

    Safety verification and handover records provided to the customer.

Our commitment

We do not compromise safety to reduce a price or to finish a week early.

Safety locks, door interlocks, safety circuits and access controls must never be bypassed or tampered with — by us, or by anyone else working on your elevator.

Planning an elevator? Start with the site, not the price list.

Send us your drawings or shaft dimensions and we will tell you what actually fits — and what it will genuinely cost to do properly.