
06 / Service & AMC
Support that earns the next contract.
Preventive maintenance, AMC, breakdown support and modernization for elevators we installed — and for those we didn't. We recommend work because it protects your elevator, not to fill a schedule.
Services
Everything your elevator needs after handover.
- 01
Preventive maintenance
Scheduled inspection, cleaning, lubrication and adjustment that prevents breakdowns before they happen.
- 02
Annual Maintenance Contract (AMC)
Planned visits and priority support under clear, written terms. Never a condition of purchase.
- 03
Breakdown support
Responsive attendance when your elevator stops, with safe passenger rescue as the first priority.
- 04
Safety inspections
Checks of door interlocks, safety circuits, brakes and rescue provisions.
- 05
Troubleshooting
Systematic fault-finding that fixes the cause, not just the symptom.
- 06
Component replacement
Worn parts replaced with suitable components — with the reasons explained to you.
- 07
Modernization
Controller, drive, door and safety upgrades that make an ageing elevator reliable again.
Our approach
If something can safely wait, we will tell you.
AMC is never a condition of buying from us. Every elevator does need regular qualified maintenance — with Rudrax or with another qualified provider of your choice.
FAQ
Questions customers ask us.
How long has Rudrax been around?
+
Our founders have worked in elevators since 2015 and have installed 200+ elevators. Rudrax Elevator started in 2017 as a proprietary firm and became Rudrax Elevator Systems Private Limited in 2026, giving customers a more formal, accountable structure as we take on larger projects.
Are Rudrax elevators safe?
+
Yes. Every configuration includes the applicable safety systems, and nothing is handed over before testing and commissioning.
Do you outsource installation?
+
No. Our own team, our own supervision.
Is AMC compulsory?
+
No. But every elevator needs regular qualified maintenance, with us or another qualified provider.
Can I choose another service provider?
+
Yes, where technically and legally appropriate, using qualified professionals.
Can you customise?
+
Yes: shaft, load, travel, speed, usage, aesthetics and power.
How long does installation take?
+
A minimum of 45 working days from site readiness, depending on configuration, floors, and shaft and power readiness. We give you a realistic timeline with the quotation.
Need maintenance or a breakdown visit?
Call or WhatsApp us on +91 97423 74543 — we will get back to you within one working day.